Project Location:
Guizhou, China
Project Introduction:
In January 2021, the Guizhou Agricultural Vocational College's teaching demonstration project undertaken by Shenzhen Solartech Guizhou Partner was successfully installed and accepted in Baiyi Town, Wudang District, Guiyang.
Solution:
The system uses Solartech SPB43K0100 solar pumping system, equipped with durable PB solar controller and AC solar deep well pump. The solar irradiance in Guiyang is relatively weak compared with other areas. Solartech MPPT multi-criterion dynamic VI maximum power point tracking patented algorithm solves this problem to the greatest extent.
Social Benefits:
The system has good operating stability, and the maximum use of solar energy has solved the poor tracking effect and unstable operation of the traditional MPPT method in areas with poor sunlight. The owner gave a very high evaluation!